AMF20 Generator controller module--Single genset controller for prime power and standby power application,direction connection to EFI engine;Total remote and monitoring and control.AMF-20 amf20 Controller AMF25Replace AMF-25 Control Module Controller For Genset
N0. | Electrical Energy Transmission | Three-phase electricity |
1 | Voltage | 8V -35V continuous |
2 | Current | Continuous 5A, |
3 | Battery range | 0V - 70Vdc |
4 | Resolution | 0.1V |
5 | Overall size | 275*160*95mm |
6 | Weight | 0.9KG |
7 | Frequency range | 3.5Hz-75Hz |
The DSE705 Deep Sea Controller can be configured to follow the users' pre-set start and stop sequences.
Atechi Power Machinery Co., Ltd. is a professional supplier of generator spare parts and accessories. We provide full range of spare parts and accessories for generating set which include control module, sensors, meters, fuel pumps, mains floating charger, relay, engine starter, DC alternator, solenoid, lock and hinges, soundproof material, ATS etc.
in one word, Atechi aims to provide one-stop service for your generator spare part demand. The quality of our spare parts is very reliable because we have used original and genuine spare parts used by the original engine manufacturer. For instance, engine manufacturer A is using B Company's engine starter, then we buy directly from B Company for engine starter. We use some famous products such as Woodward stop solenoid, Fleetguard filters, Mitsubishi starter motor and alternator etc. We also are very familiar with quality parts and accessories suppliers in China. Engine brands we serve Those engine brands which we can provide spare parts service includes LOVOL, Yangdong, Weichai, YTO, WEICHAI DEUTZ, Volvo, etc. The staff of Atechi Machinery is honest, responsible and considerate. They are with good experience in generator industry, too. That's because Atechi people clearly understand that good service, good products and being innovative are the key factors to survive and develop in a time full of fierce and transparent competition.
Payment: 100% payment before delivery for Stock goods;30% deposit and balance before delivery for production goods
Delivery : 80% goods are in stock can delivery with 24hours. Production goods will cost 3-7days usually according to the quantity.