Hfpv-1 Hydraulic Press Pile Driver Drilling Rig for Photovoltaic Piling

Model NO.
Hfpv-1
Certification
EPA, CS, CE, RoHS
Condition
New
Weight(Kg)
5800
Host Power(Kw)
84
Dimension(L*W*H)(mm)
6500*1970*2680
Walk Speed(Km/H)
0--2.5
Work Pressure(Bar)
130---180
Once Promotion(mm)
5000
Impact(J)
750
Impact Frequency(Bpm)
500--950
Transport Package
International Standard
Specification
CE, ISO
Trademark
HF
Origin
China
HS Code
843041
Production Capacity
30sets/Month
Reference Price
$ 23,400.00 - 45,000.00

Product Description

Product Details                                                                

HFPV-1 solar drill rig, using new type of hydraulic technology, convenient for hole transfer. The drilling machine structure is compact,.while the mast has adjustable compensation function, when drilling, the mast supported on the ground, borehole stability is good. The machine hydraulic pressure can be adjusted according to different soil textures, so as to achieve the appropriate impact power for pile driving, it is a new type of pile driver.

Application

The drilling rig is mainly used in pile driving for photovoltaic solar power station, pile driving for Highway guardrail, highway guardrail construction engineering construction, etc.

Hfpv-1 Hydraulic Press Pile Driver Drilling Rig for Photovoltaic Piling
The drilling rig is mainly used in pile driving for photovoltaic Solar power station , pile driving for Highway guardrail, highway guardrail construction engineering construction, etc.

Technical parameters                                                                          
Hfpv-1 Hydraulic Press Pile Driver Drilling Rig for Photovoltaic Piling
Impact frequency(bpm)   500--950
Impact(j)750
Work pressure(bar)130---180
Once promotion(mm)5000
Skid pitch(°)120
Boom swing angle(°)left and right total 50
Swinging angle of skid(°)left and right total 40
Host power(KW)84
Climb ability(°)35
Weight(Kg)5800
Walk speed(km/h)0--2.5
Dimension(L*W*H)(mm)6500*1970*2680

Bulk Export to Southeast Asia                                          
We will follow the normal and safe packing and transportation to ensure the safe arrival of the goods. We export to many countries, has rich experience in loading the drilling rig, export standard containers are 20GP, 40GP, 40HQ container, or FR in the case of bulk parts

Hfpv-1 Hydraulic Press Pile Driver Drilling Rig for Photovoltaic Piling
Working Site                                                                     
Hfpv-1 Hydraulic Press Pile Driver Drilling Rig for Photovoltaic Piling
Company Introduction                                                               
Hanfa Group established in 1998 is a key enterprise in the industry of geological exploration and water well field, with the ability to research,manufacture and market. Now, the Group pursues high standard manufacturing and qualified products. It has more than 20 species such as water well drilling rig, core drilling rig, engineering drilling rig, DTH drilling rig,
horizontaldirectional drilling rig, etc. These machines are mainly used in geological prospecting, exploration of railway and
highway engineering, mining, SPT, water well, geothermal well etc. Some of them won the Scientific and Technical Advance Prize or the National Scientific Research Achievement Prize. All the products have passed the quality system certification of ISO9001:2000 and are national inspection-free products.


Hfpv-1 Hydraulic Press Pile Driver Drilling Rig for Photovoltaic Piling
1. More than 30 years of experience 
The factory is located in Henan Province, China. We are very welcome to visit our factory. If
you need it, we will arrange a pick-up.
2.Top production team 
The transportation and packaging will be packaged in international standards. If you have special packaging requirements, we will give you the most suitable solution.
3.Our Service 
- New machine provides technical trair.
- Once anything goes wrong with the machine by normal using, our technical person must appear at the first time no matter where you are.
- When the machine should be maintained, you will receive the reminding from us.
- According to different geological conditions, we will recommend different construction plans for you
- Remind you which are wearing parts, so you can prepare enough.
- 24 hours respond to your quality problem.

Hfpv-1 Hydraulic Press Pile Driver Drilling Rig for Photovoltaic Piling
Hfpv-1 Hydraulic Press Pile Driver Drilling Rig for Photovoltaic Piling
Our Customers                                                                     


Hfpv-1 Hydraulic Press Pile Driver Drilling Rig for Photovoltaic Piling

Hfpv-1 Hydraulic Press Pile Driver Drilling Rig for Photovoltaic Piling

 

 

COMICGENESIS.COM, 2023