3 Pass Industrial Horizontal Automatic Multi Fuel Central Heating Hot Water Steam Generator Boiler

Structure
Fire Tube
Media
Steam
Water Circulation
Forced Circulation
Drum Placement
Horizontal Boiler
Pressure
Low Pressure
Manufacturing Level
A
Burning Style
Chamber Combustion Boiler
Usage
Industrial
Transport Package
Naked by 40′ Ot or Flat Rack Containers
Trademark
QD Hammer
Origin
Qingdao
HS Code
84021900
Production Capacity
10sets/Month
Package Size
420.00cm * 220.00cm * 360.00cm
Package Gross Weight
6500.000kg
Reference Price
$ 9,000.00 - 180,000.00

Product Description

3 Pass Industrial Horizontal Automatic Multi Fuel Central Heating Hot Water Steam Generator Boiler
DZL
Series Hot Water Boiler Specification

 The DZL series easy installation steam boiler is the most advanced water-fire

tube boiler in China, which is strong, high efficiency, but with small
installation space, long life.
  The ameliorated boiler uses the wing smoke flue, one-way threaded smoke pipe,
arch tube sheet, smoke-gas segregation room, and several other advanced
technologies so that the boiler bearing condition could be ameliorated, the
circulating water flow speed could be improved and the safety coefficient could be enhanced.
  This series boiler is well designed, compactly made-up, quickly installed, mono layer, so that the civil engineering and the investment could be saved. This amelioration, which extends the boiler's working life and is the national energy saving product, makes great contribution to the further development of boiler, it sets the pace in china and fill up the national margin.

 
   Boiler Model    DZL1.4-0.7/95/70-AIIDZL2.8-0.7/95/70-AIIDZL4.2-1.0/
115/70-AII
DZL5.6-1.0/
115/70-AII
DZL7.0-1.0/
115/70-AII
DZL14-1.25/
115/70-AII
Rated Evaporation CapacityMW1.42.84.25.67.014
Operation PressureMpa0.70.71.01.01.01.25
Steam TemperatureºC9595115115115115
Water-inlet TemperatureºC707070707070
Boiler Heating Efficiency%≥76.6≥78.8≥79≥82≥82≥83
Area of StokerM23.045.147.411.411.420.8
Coal Available II type bitumite, low heat capability:17700-21000KJ/kg 
Water Pump Model IS80-65-160IS100-80-160IS125-100-200IS125-100-200IS125-100-200IS125-100-250
Motor PowerKW7.51530455575
Blast Fan Model G6-41-13
NO5.4A
G6-41-13
NO6.4A
G6-41-13
NO7.1A
G6-41-13
NO8.5A
G6-41-13
NO8.5A
TG20-1
Ventilation m3/h4358-23107358-359610354-539418137-936918137-936732079
Wind PressurePa994-12541181-14361697-22702535-33912535-33912559
Motor PowerKW35.57.518.518.537
Induced Draft FanModel Y6-41-13
NO5.4C
Y6-41-13
NO7.1C
1Y6-41-13
NO10C
Y6-41-13
NO11.2D
Y6-41-13
NO11.2D
GY20-15
Ventilationm3/h8901-435015219-817132144-1660741773-2157841773-2157873308
Wind PressurePa2568-32402454-32832574-34442764-36972764-36973515
Motor PowerKW1122374555110
Dimensions of Biggest Parts for ShipmentM5.82×2.26×3.226.51×2.6×3.527.5×2.9×3.57.1×3.2×3.57.5×3.2×3.59.1×2.4×3.55
Weight of Biggest Parts for ShipmentT192835374030
Remark: This parameter is just for reference, for exact parameter, suject to our drawings.
3 Pass Industrial Horizontal Automatic Multi Fuel Central Heating Hot Water Steam Generator Boiler
3 Pass Industrial Horizontal Automatic Multi Fuel Central Heating Hot Water Steam Generator Boiler


SZL Series Hot Water Boiler Specification
  SZL water tube easy installation(assembled) boiler has 2 vertical steam drums, and the
innovative horizontal cyclone-fired combustion chamber, which could effectively enhance
the thermal efficiency and reduce the flue gas emission concentration. The flue gas emission  
concentration is lower than 100 mm/nm3, the flue gas blackness is lower than Ringelmann
level 1,which enables the boiler to be used in the first-class environment protected area.
The boiler installs one cast iron economizer at its back body, the fire-gate applies the
chamber-segregated ventilation structure, which is easy to adjust. The separate-layer coal
supply device could be chosen according to the customer requirement. Advantages of
such boiler are: strong power, high thermal efficiency, 110% override capability,
compactly designed, small floor area.
 
Boiler ModelSZL4.2-1.0/
95/70-AII
SZL5.6-1.0/
95/70-AII
SZL7.0-1.0./
115/70-AII
SZL10.5-1.25/
115/70-AII
SZL14-1.25/
130/70-AII
Rated Evaporation CapacityMW4.25.67.010.514
Operation PressureMpa1.01.01.01.251.25
Steam TemperatureºC9595115115130
Water-inlet TemperatureºC7070707070
Heating Efficiency %≥80≥80≥80≥81≥82
Area of Stoker M27.158.611.7216.418.9
Coal Available II type bitumite,low heat capability:17700-21000KJ/kg
Water PumpModel IS125-100-
200
IS125-100-
200
IS125-100-
250
IS125-100-
250
IS200-150-
315
Motor PowerKW3045557575
Blast FanModel G6-41-13
NO7.1A
G6-41-13
NO8.5A
G6-41-13
NO8.5A
TG15-1TG20-1
Ventilation m3/h5349-103549369-181379369-181372300032079
Wind PressurePa1697-22702535-33912535-339119602559
Motor PowerKW7.518.518.52237
Induced Draft FanModel Y6-41-13
NO10C
Y6-41-13
NO11.2D
Y6-41-13
NO11.2D
TY15-2GY20-15
Ventilationm3/h32144-
16604
41773-
21578
41773-
21578
4000073308
Wind PressurePa2575-34442764-36972764-369730383515
Motor PowerKW37454575110
Dimensions of Biggest Parts for ShipmentM7.62×3.27×
3.46
8.82×3.34×
3.46
8.0×3.5×2.79.05×3.35×
3.69
10.6×3.35×
3.69
Weight of Biggest Parts for ShipmentT3145282427
Remark: This parameter is just for reference, for exact parameter, suject to our drawings.

FAQ:

Q: Are you manufacturer?
A: Yes, we are manufacturer. Our factory established in 1983 in Qingdao.

Q:How to choose a boiler type ?
A: Generally we should confirm the boiler type (steam or hot water),capacity,pressure(or output,temperature)and fuel(coal, biomass, gas or oil) of the boiler.

Q: How long is the warranty time for the boilers?
A: Based on highly responsible for your esteemed company, due to equipment itself failure, our company provides one year free maintenance.

Q: How about the installation ?
A:We could offer you 2 proposals.
   i)Guide installation
     Our company arranges 1-2 staffs to guide the installation of boiler on site , fully guarantee the installation quality. 
   ii)Staff installation
     Our company is in charge of installation process, only your company to provide accommodation, round-trip cost and pay the wages of workers.

Q: Could you offer some wear parts?
A: Our company provides a set of tools for free, such as wrench ,gasket used for Convenient maintenance. 

Q: What's your MOQ?
A: 1 set, if you purchase more, you will get a fairly favorable price.

Q: Do you have any Certificate?
A: Yes. We have ISO9001 & ISO14001 certificate. If must,we could help you get CE ASME or AS certificate.

Q: What is your payment term?
A: T/T, L/C is very well used.

 

PTSINDIA.NET, 2023